Limitations

*all limits only apply to my portion of the project*

The limitations of the project are the boundaries that the project must work inside of in terms of cost and construction.
  • Camera and attachment must cost under $200
  • Weight of camera and attachment must not exceed rate of buoyancy
  • Camera and attachment must not exceed the size of vessel
  • Vessel must stay within 450 feet of radio control so that it is within range of the transmitter

1 comment:

  1. mm
    ok so we have some limits on the buying of and construction of the camera housing. How about some limits on the operational phase of the project.
    DA

    ReplyDelete